Thursday 24/5/2018

Bookmark and Share
 
 
Case Studies
  PandCT RSS Case Studies feed
Pipeline Installation: DNV GL new JIP to unlock significant cost savings

8 May 2018

The design requirements of concrete coated pipelines are based on simple and general criteria created more than twenty years ago. As this does not meet the complex demands of today’s larger diameter pipelines operating in deeper and more challenging environments, DNV GL is launching the second phase of a joint industry project (JIP) to develop a design guideline that complements current pipeline codes and standards.

Phase 1 of the project has now completed and involved ShawCor LLC, McDermott, PAPE Engineering, Saipem, SVAP, Wasco, and Technip FMC. This developed numerical and analytical approaches to better understand the behaviour of concrete coated pipelines.

The second phase, which is expected to last two years, is now open to pipeline operators, designers, installation contractors and coating contractors.

“Participants involved in the first phase of the project successfully created comprehensive models and approaches to better understand the vast array of factors to determine pipeline concrete coating behaviour and thereby save significant costs during installation and operation. To incorporate these results into pipeline codes and standards, and therefore unlock significant potential savings, they need to be confirmed through physical testing,” said Brice Le Gallo, Regional Manager, South East Asia and Australia, DNV GL – Oil & Gas.

Phase 2 will verify and further develop the extensive results achieved from the initial desktop study. The scope of work will involve the collection of full-scale bending test data using large diameter pipeline sections with different types of anti-corrosion coating between the steel pipe and the concrete coating. Bending into the nonlinear strain range will be investigated alongside multiple reversed bending cycles and internal pressure. Field joint infill with significant stiffness and strength will also be included in the test program. An extensive experimental and numerical database will then be developed to support the understanding on the behaviour of concrete coated pipelines with a wide range of geometrical, material and loading parameters.

“Phase 1 of the JIP revealed significant potential for cost savings with respect to pipeline installation. Weather restrictions can be relaxed, and/or stringent requirements reduced which allows more flexibility when choosing the installation vessel. These benefits now need to be confirmed by full-scale testing. The ultimate aim of Phase 2 is to develop relevant design guidelines that complement current pipeline standards. Based on deeper understanding, the design can be more comprehensive and save cost for installation and operation. This will give greater confidence and clarity on safety margins and reduce cost by mitigating overdesign,” added Olav Fyrileiv, Technology Leader for Pipeline and Material, with DNV GL – Oil & Gas.

For more information, please contact:

DNV GL - Oil & Gas
Tel:  +44 (0) 7876 578 353
Email: neil.slater@dnvgl.com
Web:  www.dnvgl.com
PandCT.com are not responsible for the content of submitted or externally produced articles and images.
Click here to email PandCT about any errors or omissions contained within this article.
     
Send this page
To send this page to a colleague or friend,
fill in the email addresses below...
Your email address
Their email address:
Page to be sent: shownews.asp?ID=51051

Company gateway pages
for DNV GL :
FREE Information on the products in this article
To request more information from this supplier,
fill in your email address below.
Your email address
 
     
Bookmark and Share
Product categories: Accelerometers | Actuators | Agitators | Analysers | Bearings | Compressors | Controllers | Conveyors | Drives | Enclosures | Flowmeters | Heat Exchangers | Motors | Pumps | Relays | Sensors | Transducers | Transmitters | Valves | Weighing
(c) Copyright 1999-2018 Process and Control Today Ltd  |  Reg. no 3733110  |  Email Editor  |  Email Webmaster  |  Sitemap  |  Privacy Policy