In focus manufacturing

The leading and longest established online Process Engineering publication serving the Process Manufacturing Industries

New Kennametal Quick-Change Block System Drastically Reduces Change Time; Maximizes Uptime

New design features increase reliabilityKennametal's QC42 Quick Change Block System cuts block change time from 60 to 90 minutes down to 10 to 15 minutes, dramatically improving machine uptime.

With the right tools for the right application, attacking even the most difficult cutting conditions is made easier. With many mines moving to a »no blasting, no drilling» mode, surface miner machines are encountering more severe cutting work. With a new no-welding modular block system, Kennametal's QC42 Quick Change Block System cuts the time needed to change the block from the machine base from 60 to 90 minutes down to 10 to 15 minutes, dramatically improving machine uptime.

The QC42 system incorporates many new design features to make it more productive and reliable:
-a new 1070 spring steel retainer provides an added safety feature to keep the unit together when not fully engaged from a tapered press fit.
-rubber bumper stops keep the block from over-locking.
-a newly designed hardfaced block face ensures better conical rotation and minimizes wear.

For surface mining and trenching machines, the new QC42 Quick Change Block system reduces tool-change time and features a no-weld design for a safer work environment, taking machine uptime and productivity to a whole new level.

For more information, please contact:

Kennametal Shared Services GmbH
Wehlauer Strasse 73
D-90766 Fuerth
Carsten GROMOLL
Tel:  +49 911 9735 557
Fax:  +49 911 9735 551
Email: carsten.gromoll@kennametal.com
Web:  www.kennametal.com.

Request FREE information from the supplier on the products in this article

Login or Register

Process and Control Today are not responsible for the content of submitted or externally produced articles and images. Click here to email us about any errors or omissions contained within this article.

Get the weekly eNewsletter from Process and Control Today