EMERSON DeltaV

The leading and longest established online Process Engineering publication serving the Process Manufacturing Industries

ECS to build 8 radial weir gates for EA refurbishment of Thames structure

ECS Engineering Services has recently secured a deal to supply eight radial weir gates to the Environment Agency (EA) as part of a project to improve the Old Windsor Weir on the River Thames. Using the latest 3D survey equipment, ECS has been able to develop precision drawings for the fabrication team in record time, ensuring the contract will be delivered on time.

As a framework contractor for the EA, ECS has considerable experience in refurbishing large water control structures and is often called upon to deliver turnkey projects. ECS also has a distinguished history of steel fabrication and is certified to fabricate and install structures classed up to execution class 3 (EXC3), buildings and bridges, under the CE marking legislation.

In this case, as soon as the go-ahead was given, ECS was able to survey the site in detail using its advanced surveying equipment, which enabled the design teams to start work almost immediately. Although the site appears to use eight identical radial weir gates, the RTS survey equipment can soon determine any differences, which will ensure that every new gate will fit perfectly.

A Robotic Total Station (RTS) is an extremely accurate survey instrument that provides a sub-millimetre level of accuracy and can be used to collect sufficient data to create a 3D model as well as fabrication drawings. Using this advanced equipment has allowed ECS to minimise any delays at the beginning of the project and also develop a full set of 3D visuals for the client as well as any other interested parties.

Steve Crapper, Business Development Manager, commented: "In projects such as this, it is essential to get the initial data collected quickly and accurately. By using our RTS equipment and the data it collects, the design engineers are able to create the fabrication drawings more efficiently which helps to streamline the project as a whole."

For more information, please contact:

Jamie Wesley, Commercial Manager - Water Control Division
ECS Engineering Services Ltd
Fulwood Road South
Huthwaite
Nottinghamshire
NG17 2JW 
Tel:  +44 1773 860001
Fax:  +44 1773 810003
Email: jwesley@ecsengineeringservices.com
Web:  www.ecsengineeringservices.com

Request FREE information from the supplier on the products in this article

Login or Register

Process and Control Today are not responsible for the content of submitted or externally produced articles and images. Click here to email us about any errors or omissions contained within this article.

Get the weekly eNewsletter from Process and Control Today